Latest Traffic Report: 9/25/17

List of all scheduled closures and restrictions on the Zoo Interchange Project from September 25 – October 1:

Monday (9/25)

Zoo Interchange Project

– a lane will be closed 7am through 9/29/17 84th St NB/SB from Greenfield Ave to State Fair Gate 4 for City of West Allis pavement restoration.

– a lane will be closed during the day Greenfield Ave WB from Vista View Dr to Moorland Rd for STOC DMS repair.

– a lane will be closed overnight I-41 NB/SB at south of Hampton Ave for pinning barrier wall.

 

Valley Bridges/ Marquette Interchange Project

– a lane will be closed overnight I-94 EB at the Marquette Int for milling.

 

Waukesha Co Joint Repair Project

– there is a moving lane closure overnight I-94 EB/WB from STH 164 to CTH BB for pavement markings.

 

Tuesday (9/26)

Zoo Interchange Project

– a lane will be closed 9/25 through 9/29/17 84th St NB/SB from Greenfield Ave to State Fair Gate 4 for City of West Allis pavement restoration.

– a lane will be closed overnight I-41/894 SB from the Zoo Int to north of Lincoln Ave for noise wall panels.

 

Valley Bridges/ Marquette Interchange Project

– lanes will be closed overnight I-43 SB from Highland Ave to Menomonee River for PPC overlay.

– a lane will be closed overnight I-94 EB at the Marquette Int for milling.

 

Waukesha Co Joint Repair Project

– there is a moving lane closure overnight I-94 EB/WB from STH 164 to CTH BB for pavement markings.

 

Wednesday (9/27)

Zoo Interchange Project

– a lane will be closed 9/25 through 9/29/17 84th St NB/SB from Greenfield Ave to State Fair Gate 4 for City of West Allis pavement restoration.

– a lane will be closed overnight I-41/894 SB from the Zoo Int to north of Lincoln Ave for noise wall panels.        *contingency is Thursday 9/28

– a lane will be closed overnight on HWY 100 SB from Research Dr to Mount Vernon Ave.

 

Valley Bridges/ Marquette Interchange Project

– lanes will be closed overnight I-43 SB from Highland Ave to Menomonee River for PPC overlay.

– the Marquette Int N-E system ramp will be closed overnight for punch list and repair work.

– a lane will be closed overnight I-94 EB at the Marquette Int for pavement marking.

 

Waukesha Co Joint Repair Project

– there is a moving lane closure overnight I-94 EB/WB from STH 164 to CTH BB for pavement markings.

 

Thursday (9/28)

Zoo Interchange Project

– a lane will be closed 9/25 through 9/29/17 84th St NB/SB from Greenfield Ave to State Fair Gate 4 for City of West Allis pavement restoration.

– there is a full closure overnight I-41/894 NB at National Ave for traffic shift and pavement markings.         *contingency is Friday 9/29

 

Valley Bridges/ Marquette Interchange Project

– a lane will be closed overnight I-94 EB at the Marquette Int for PPC overlay.

– a lane will be closed overnight I-94 WB at the Marquette Int for pavement marking.

– lanes will be closed overnight I-43 SB from Highland Ave to Menomonee River for pavement marking.

 

Waukesha Co Joint Repair Project

– there is a moving lane closure overnight I-94 EB/WB from STH 164 to CTH BB for pavement markings.

 

Friday (9/29)

Zoo Interchange Project

– the lane closure on 84th St NB/SB from Greenfield Ave to State Fair Gate 4 for City of West Allis pavement restoration will reopen to traffic by 7am.

– a lane will be closed during the day I-41 NB/SB from South of Hampton Ave to Capitol Dr for replacing lighting.

– there will be a long-term full closure 8pm through late 2017 National Ave entrance ramp to I-41/894 SB for ramp reconstruction.     *contingency is Monday 10/2

– lanes will be closed overnight I-41/894 SB at Lincoln Ave for asphalt work and traffic switch.         *contingency is Monday 10/2

– the Zoo Int W-S system ramp will be closed overnight for asphalt work and traffic switch.              *contingency is Monday 10/2

– there will be a full closure overnight I-41 SB at Bluemound Rd for asphalt work and traffic switch.   *contingency is Monday 10/2

– lanes will be closed overnight I-41/894 NB from Cleveland Ave to north of Lincoln Ave for barrier wall work.

 

Valley Bridges/ Marquette Interchange Project

– there will be an extended full closure 11pm through 10/2 I-794 EB at Marquette Int (W-S & W-N are open) for PPC overlay, pavement marking, lighting and painting work.         *contingency is Friday 10/6

– there will be an extended lane closure 11 pm through 10/2 on Marquette Int W-S system ramp for PPC overlay, pavement marking, lighting and painting work.

 

Waukesha Co Joint Repair Project

– there is a moving lane closure overnight I-94 EB/WB from STH 164 to CTH BB for pavement markings.

 

Saturday (9/30)

Zoo Interchange Project

– the long-term full closure of the Greenfield Ave entrance ramp to I-41/894 SB reopens to traffic by 9am.          *contingency is Tuesday 10/3

– a lane will be closed early morning on HWY 100 NB at Theo Trecker Way for survey work.

 

Valley Bridges/ Marquette Interchange Project

– there will be an extended full closure 9/29 through 10/2 I-794 EB at Marquette Int (W-S & W-N are open) for PPC overlay, pavement marking, lighting, and painting work.

– there will be an extended lane closure 9/29 through 10/2 on Marquette Int W-S system ramp for PPC overlay, pavement marking, lighting, and painting work.

 

Sunday (10/1)

Zoo Interchange Project

– there will be a full closure during the day Greenfield Ave EB/WB from 76th St to 70th St for City of West Allis Annual Classic Car Show.

 

Valley Bridges/ Marquette Interchange Project

– there will be an extended full closure 9/29 through 10/2 I-794 EB at Marquette Int (W-S & W-N are open) for PPC overlay, pavement marking, lighting, and painting work.

– there will be an extended lane closure 9/29 through 10/2 on Marquette Int W-S system ramp for PPC overlay, pavement marking, lighting, and painting work.

 

Long-Term Closures

Zoo Interchange Project

– there will be a full closure of the Greenfield Avenue entrance ramp to I-41/894 SB through 9/30/17 for roadway construction.

– a lane will be closed on Curtis Rd NB/SB under I-94 through Fall 2017 for roadway construction.

– there will be a full closure of the HWY 100 entrance ramp to I-94 WB through Fall 2017 for ramp reconstruction.

– there will be a full closure of the I-94 WB exit ramp to HWY 100 through Fall 2017 for ramp reconstruction.

– there will be a full closure from 100th St NB/SB from Orchard St to Maple St through Fall 2017 for roadway work.

– a lane will be closed Watertown Plank Rd EB/WB from HWY 100 to 115th St through mid-November 2017 for bridge reconstruction.

– a left-turn lane will be closed HWY 100 NB at Watertown Plank Rd through mid-November 2017 for bridge reconstruction.

– there will be a full closure of the Zoo Int E-S system ramp through late November 2017 for ramp reconstruction.

– there will be a full closure of the I-94 EB exit ramp to 84th St (from I-94 EB and I-41 SB) through late November 2017 for roadway reconstruction.

– there will be a full closure of the Greenfield Ave entrance ramp to I-41/894 NB (to I-41 NB and I-94 WB) through late 2017 for ramp reconstruction.

– there will be a full closure of the 84th St entrance ramp to I-94 WB (to I-94 WB) through late 2017 for roadway reconstruction.

– there will be a full closure of the Deer Creek Trail/Oak Leaf Trail NB/SB at I-94 through late 2017 for bridge reconstruction (one trail will remain open at all times).

– there will be a full closure of the I-41 NB exit ramp to Bluemound Rd through late April 2018 for ramp reconstruction.

– there will be a full closure of the I-41/894 SB exit ramp to Greenfield Ave through early Summer 2018 for roadway construction.

– there will be a full closure of the I-41/894 SB exit ramp to Lincoln Ave through early Summer 2018 for roadway construction.

– there will be a full closure of the National Ave entrance ramp to I-41/894 SB beginning on 9/29 through late 2017 for roadway construction.

– there will be a full closure of Schlinger Ave EB/WB under I-41/894 through late Summer 2018 for project construction.

– the Hank Aaron State Trail will be closed to pedestrians from 94th Pl to Oak Leaf Trail through late Summer 2018 for project construction.

– there will be a lane closure of HWY 100 NB/SB at Beloit Rd through 11/18/17 for utility work.

 

Nor-X-Way Channel Project

– there will be a full closure long-term through early Winter 2017 of the I-41 NB exit ramp to Main St EB for reconstruction.

– there will be a full closure long-term through early Winter 2017 of the Main St entrance ramp to I-41 SB for reconstruction.