Overview
The Wisconsin Department of Transportation (WisDOT) plans to improve the pavement conditions and improve ride quality and safety. Pavement surface has deteriorated with numerous cracks, ruts, and spot surface repairs. This project is 14.9 miles in length, begins at WIS 35 and ends at WIS 27.
The Wisconsin Department of Transportation (WisDOT) plans to improve the pavement conditions and improve ride quality and safety. Pavement surface has deteriorated with numerous cracks, ruts, and spot surface repairs. This project is 14.9 miles in length, begins at WIS 35 and ends at WIS 27. more…