Project Overview
The pavement on this section of WIS 69, between Bushnell Creek in the Town of Monroe and Cow Path Lane in New Glarus, is deteriorating with extensive cracking.
Improvements include:
- Install centerline and shoulder rumble strips
- Add new pavement markings
- Replace deteriorating culverts
- Replace guardrail
- Addition of southbound left-turn lanes at Wittenwyler Road and Cemetery Road
- Addition of a single-lane roundabout at County C/Urban Road
- WIS 69 bridge over the Little Sugar River in Monticello will be repaired, including a deck replacement