Overview
Crews will complete concrete pavement joint and crack repairs, concrete pavement replacement, resurface the existing asphalt pavement, replace existing guardrail, install shoulder rumble strips, and complete rehabilitation work on the WIS 29 (eastbound) structure over the South Branch Embarrass River
Crews will complete concrete pavement joint and crack repairs, concrete pavement replacement, resurface the existing asphalt pavement, replace existing guardrail, install shoulder rumble strips, and complete rehabilitation work on the WIS 29 (eastbound) structure over the South Branch Embarrass River more…