Back to Regions
SouthWest
- Lansing Bridge Project
- I-39/90/94 Bridge over Wisconsin River
- WIS 35 (County N to County E)
- US 18/151 (County G to WIS 69)
- US 51 (Spring Road to 5th Street)
- US 61/US 151/WIS 11 (Mississippi River to County HH)
- WIS 35 (La Crosse County Line to Sunnyside Drive)
- I-94 (Cranberry Interchange)
- US 14 (Bohmann Drive to County O)
- US 12/18 and County W/Oak Park Road intersection
- US 18/151 and County F intersection
- WIS 33 (WIS 73 to Forest Street)
- I-39 (US 12/18 to Lien Road)
- US 12 and WIS 188/Tetiva Road intersection
- WIS 11 and WIS 23/County P intersection
- US 51 (Harrison Street to County B/AB)
- US 51 (Tower Road to Exchange Street)
- WIS 78 (Lien Court to County H)
- WIS 23 (Pine Street to Rowe Road) and US 18 and Johns Street intersection
- WIS 78 (Elma Avenue to County DL)
- I-94 and WIS 26 interchange
- WIS 131 (WIS 82 to WIS 33)
- I-90 La Crosse area bridges
- WIS 81 and County T intersection
- I-39 (County V to North Dane County line)
- WIS 67 (WIS 60 to West Junction County S)
- WIS 171 (WIS 27 to US 61)
- WIS 19 (Division Street to River Road)
This site provides extended information for construction projects currently underway throughout Wisconsin, with the same real-time conditions information found on the main 511 Wisconsin website.
For information about other plans or studies, visit the Wisconsin DOT website. Statewide real-time traveler information is available by dialing 511 or visiting the main 511 Wisconsin website.