Overview
The project will address 3.9 miles of deteriorating pavement on WIS 113 from Sunset Lane to County Trunk Highway V in Dane County. The project will consist of removing and replacing 4 inches of asphaltic pavement. The bridge over Six Mile Creek will be replaced with a wider bridge to meet future traffic projections and bring up to current standards.
- Construction schedule: June 17 - mid-September 2024
The project will address 3.9 miles of deteriorating pavement on WIS 113 from Sunset Lane to County Trunk Highway V in Dane County. The project will consist of removing and replacing 4 inches of asphaltic pavement. The bridge over Six Mile Creek will be replaced with a wider bridge to meet future traffic projections and bring up to current standards.
- Construction schedule: June 17 - mid-September 2024