Traffic Impacts
WIS 13 remains open to traffic, but motorists will encounter:
- Single-lane closures controlled by temporary traffic signals at Becky Creek
- Single-lane closures controlled by temporary traffic signals at active culvert pipe installations once work resumes Tuesday, Sept. 8
- Signals at Becky Creek are in place continuously. Those at culvert pipe locations are in place during work hours only.
- Single-lane closures controlled by flagging during paving at culvert sites once work resumes Sept. 8