WIS 13, Morse Road to Price County Line

Ashland County 

Project Overview

Construction includes:

  • Replacing, resetting, extending or abandoning more than 50 existing culvert pipes and constructing a new box culvert at Becky Creek
  • Making concrete surface repairs at the bridge over Dryden Creek northwest of Glidden
  • Patching the deck on the bridge over the Chippewa River southeast of Glidden
  • Overlaying the deck with concrete on the bridge over Butternut Creek south of Butternut
  • Replacing guardrail at the structures and one other location in the project limits