Project Overview
Construction includes:
- Replacing, resetting, extending or abandoning more than 50 existing culvert pipes and constructing a new box culvert at Becky Creek
- Making concrete surface repairs at the bridge over Dryden Creek northwest of Glidden
- Patching the deck on the bridge over the Chippewa River southeast of Glidden
- Overlaying the deck with concrete on the bridge over Butternut Creek south of Butternut
- Replacing guardrail at the structures and one other location in the project limits