Project Details
This project will reconstruct US 45 from Rawson Avenue to College Avenue in Franklin, addressing the deteriorating pavement conditions and improving traffic operations.
Project Improvements:
- Reconstruct existing roadway
- New pedestrian sidewalks and shoulder for bike accommodations
- Replace the traffic signal at Speedway Drive
- Replace the storm sewer system
- New detention pond
- New pavement marking and signing
Traffic Impacts
Work will be completed in stages with US 45 remaining open to traffic during construction. See the updates page for latest project information.
- Stage 1 consisting of preconstruction work was completed in 2023.
- Stage 2 will move all traffic to the northbound lanes while the southbound lanes are reconstructed in spring/summer.
- Stage 3 will move all traffic to the southbound lanes while the northbound lanes are reconstructed in summer/fall.
Side streets may close at different times throughout this process. Access to local residences and businesses will be maintained.