Project Overview
The project will address 8.8 miles of pavement on WIS 80 from County Road I to WIS 133 between the Village of Highland and the Village of Avoca in Iowa County. The project will consist of resurfacing pavement (removing the top 2-inches of asphaltic pavement and adding 2-inches of asphaltic pavement) from County Road I to WIS 133.
Additional improvements include:
- Replacement of WIS 80 bridge over an unnamed tributary to Morrey Creek approximately 500 feet north of Dry Dog Road
- Replacement of guardrail at the bridge approaches
- Installation of centerline rumble strips between County Road I and County Road P N junction
- Installation of shoulder rumble strips from County Road P N junction to Old State Road 80
- Installation of permanent pavement marking
- Installation of a high friction surface treatment on the horizontal curve near the Aide Road intersection