Overview
The purpose of the project is to address the existing asphalt pavement, which is showing signs of deterioration in the form of transverse cracking, rutting and alligator cracking. The existing guardrail and curb ramps do not meet current standards and is in need of updating.
- Construction schedule: March 2 - September 2026
The purpose of the project is to address the existing asphalt pavement, which is showing signs of deterioration in the form of transverse cracking, rutting and alligator cracking. The existing guardrail and curb ramps do not meet current standards and is in need of updating.
- Construction schedule: March 2 - September 2026