Schedule and Traffic Impact
Page last updated: June 26, 2026
Schedule: April 27 to Aug. 28, 2026
Anticipated work scheduled: Crews will:
- Continue placing base material
- Place topsoil
Traffic impacts (the next 10 days):
- WIS 73/80 Intersection is closed. Traffic is detoured via County X to WIS 54 to WIS 73. County A is detoured County C.
- WIS 80 shoulder closures will be unutilized to direct pedestrians around the curb ramp work.
- Roadway will have 11-foot width restriction.
- Periodic flagging operations will occur when operations impact the travel lanes.
- Curb ramp construction will be staged so that pedestrian access will be maintained at all times.