WIS 73, WIS 80 Intersection and WIS 80

 Wood County

Schedule and Traffic Impact

Page last updated: May 1, 2026

Schedule: April 27 to Aug. 28, 2026

Anticipated work scheduled: Crews will:

  • Begin removal of curb ramps
  • Begin sawing asphalt and concrete
  • Begin curb ramp construction.

Traffic impacts (the next 10 days): 

  • Roadway will have 11-foot width restriction.
  • Single-lane closures with flaggers.
  • Pedestrian detours for curb ramp work.
    • Curb ramp construction will be staged so that pedestrian access will be maintained at all times.