Project Overview
Crews will resurface the highway, upgrade guardrails at Shady Road intersections, install concrete approach slabs at existing bridge structure over the East Branch Shioc River, improve ride quality above settled culverts, install centerline rumble strips and replace existing pavement markings along the entire project length.