Overview
Construction on WIS 35 is underway. Roadway improvements include:
- Excavation to remove and replace the Stony Brook Creek Box Culvert
- Work under the Nemadji River Bridge to repair erosion from high water in 2012
Construction on WIS 35 is underway. Roadway improvements include:
- Excavation to remove and replace the Stony Brook Creek Box Culvert
- Work under the Nemadji River Bridge to repair erosion from high water in 2012