Overview
The project will reconfigure WIS 33 from a 4-lane roadway to a 2-lane roadway with a 2-way left turn lane in the center of the roadway to improve the safety and operations of the highway.
- Construction schedule: WIS 33 is complete and open to traffic
The project will reconfigure WIS 33 from a 4-lane roadway to a 2-lane roadway with a 2-way left turn lane in the center of the roadway to improve the safety and operations of the highway.
- Construction schedule: WIS 33 is complete and open to traffic