Overview
The Wisconsin Department of Transportation (WisDOT) will resurface 15.77 miles of WIS 21 between the City of Sparta east limit and Emerson Road. The roadway is aged and deteriorated with heavy cracking and rutting in the wheel tracks.
- Construction schedule: April 28 - 2025
The Wisconsin Department of Transportation (WisDOT) will resurface 15.77 miles of WIS 21 between the City of Sparta east limit and Emerson Road. The roadway is aged and deteriorated with heavy cracking and rutting in the wheel tracks.
- Construction schedule: April 28 - 2025