Overview
WisDOT is in the process of developing plans to replace the bridge structure on WIS 19 (Main Street) over the Rock River.
- Construction schedule: April 29 - spring 2025
WisDOT is in the process of developing plans to replace the bridge structure on WIS 19 (Main Street) over the Rock River.
- Construction schedule: April 29 - spring 2025