Project Overview
WisDOT is in the process of developing plans to replace the bridge structure on WIS 19 (Main Street) over the Rock River.
Improvements include:
- New bridge structure
- New concrete approach slabs
- New lighting, asphalt pavement, and concrete sidewalk