WIS 19 (Division Street to River Road)

Waunakee, Dane County

Schedule

Construction begins: April 2026

Anticipated completion: 2026

 

Traffic impacts

  • The changing temporary configurations of STH 19 will continue into the early fall season.
  • The temporary lanes have a maximum width of 11 feet, so no wide loads can be accommodated.

 

Project update

– WIS 19 will be closed between WIS 113 and River Road October 10 and 11 for high friction surface treatment

– FULL DAY AND NIGHTTIME CLOSURE OF STH 19 – SATURDAY (10/10) INTO SUNDAY (10/11) – FROM THE STH 113 ROUNDABOUT TO THE RIVER ROAD ROUNDABOUT

  • THE STH 19 FULL CLOSURE IS FOR THE INSTALLATION OF A HIGH FRICTION SURFACE TREATMENT – FROM 6:00 AM SATRUDAY UNTIL 8:00 AM SUNDAY.
  • THIS WILL BE A FULL CLOSURE FOR ALL TRAFFIC (EMS WILL HAVE ACCESS IF NEEDED). THERE WILL BE NO SIGNED DETOUR.

– BOTH ROUNDABOUTS WILL BE FUNCTIONAL IN THE NORTH/SOUTH DIRECTIONS, INCLUDING TRAVELING WESTBOUND FROM 113 AND EASTBOUND FROM RIVER ROAD.

  • MOTORISTS WILL HAVE TO USE ALTERNATIVE ROUTES.