Project Overview
The project involves:
- Replacing the curb and gutter and asphalt pavement
- The sidewalk along the west side of WIS 17 will be widened from 5-feet to 10-feet
- Curb ramps will be replaced
- The island at the southwest corner of the Timber Drive intersection will be removed and replaced with a right turn lane