Project Overview
Constructions includes the following:
- Shoreline repair work from the west property line to Jardine Creek:
- Armoring the toe of the slope using a 6-inch-thick layer of bedding stone, a 3-foot-thick layer of underlying stone and a 6-foot-thick layer of armor stone
- Excavating a 4:1 slope from the newly constructed armored toe to the top of the existing slope
- Stabilizing the excavated slope with turf reinforcement mat and garden with topsoil and seed
- Wayside:
- Milling 2 inches of existing asphalt in the parking lot and WIS 13 entrance
- Placing 2 inches of new asphalt in the parking lot and WIS 13 entrance
- Upgrading the walking path to meet Americans With Disabilities Act standards by grading base aggregate and overlaying with 2 inches of new asphalt
- Replacing the culvert and apron end walls below the walking path to the lake and at the WIS 13 entrance to the wayside
- Replacing the timber guard posts bordering the parking area
- Repairing the crack in the concrete slab under the pavilion