Project Overview
The Wisconsin Department of Transportation (WisDOT) will improve this 12-mile section of WIS 131 from La Farge to Ontario by resurfacing the existing asphalt pavement.
Additional improvements include:
- Upgrading guardrail
- Concrete overlay on two bridges
- Bridge painting and wing stabilization on one bridge
- Curb ramp installation at the intersection of WIS 133 and WIS 33
- Culvert repairs and lining
- New cross culverts and inlets