Project Overview
The Wisconsin Department of Transportation (WisDOT) will resurface 17.6 miles of WIS 130 between US 14 and WIS 154 to address deteriorating pavement conditions.
Improvements include:
- Mill and relay the existing pavement
- Overlay the asphalt base course with 3.5-inches of new asphalt pavement
- Rehabilitation of three bridges
- Replace guardrail and end terminals
- Improve drainage in Bear Valley with grading, new storm sewer, and new culvert pipe
- Replace curb & gutter and sidewalk in Bear Valley
- Minor structure work