Schedule
On Tuesday, June 18th WisDOT Bridge Inspectors are scheduled to perform standard annual inspection on the existing south bridge. Traffic across the bridge will be flagged to a single lane most of the day starting at 8:00AM.
RIVER NAVIGATION UPDATE:
- South Channel will remain closed for the next few months
- North Channel will remain open and is currently wide open with the rock causeway removed from the channel
- Current Boating Guide attached for reference
NORTH BRIDGE UPDATE:
- Final touch-up and staining completed this week.
- Seal the deck to take place next week.
SOUTH BRIDGE UPDATE:
- Installation of deck formwork and rebar.
- Two concrete deck pours are planned for late June / early July.
Future
Spring/Summer 2024:
- Bridge substructures and superstructures, WIS 130 roadway
Fall 2024:
- Traffic shifts to new WIS 130 alignment on new bridges and roadway, start causeway access for removing old bridges
Winter/Spring/Summer 2025:
- Remove old bridges and old WIS 130 roadway core, restoration, Brace Memorial Park interpretive panels