Overview
The is a resurfacing project of 1.91 miles of WIS 116 between the village of Winneconne east limits and US 45 in the town of Winneconne. The project is scheduled to begin on September 11, 2024.
The is a resurfacing project of 1.91 miles of WIS 116 between the village of Winneconne east limits and US 45 in the town of Winneconne. The project is scheduled to begin on September 11, 2024. more…