Project Overview
THIS PROJECT IS COMPLETE AS OF OCTOBER 18, 2024.
WEBSITE FOR REFERENCE ONLY
Project Location
The is a resurfacing project of 1.91 miles of WIS 116 between the village of Winneconne east limits and US 45 in the town of Winneconne.
Project Scope
The proposed improvements include:
- Milling and resurfacing of WIS 116
- Full-depth repair of roughly 300’ along eastbound lanes of WIS 116 just east of Harbour South Drive
Schedule
Construction is expected to begin on September 11, 2024 to mid-October 2024.
WIS 116 will remain open to traffic during this project. There will be daytime single lane closures and flaggers will direct traffic around the work zone.
- No lane closures will be allowed before 8 a.m. to minimize impacts.
- Local, business, and emergency access will be maintained at all times.
- No work or hauling will be allowed during holidays.
Project Contact:
Bill Bertrand, P.E., Project Manager
WisDOT Northeast Region
944 Vanderperren Way
Green Bay, WI 54304
Phone: 920-360-3124
William.Bertrand@dot.wi.gov