The project will replace the existing pavement of WIS 113 from WIS 78 to Mound Street in City of Baraboo. A horizontal curve has been identified as a safety issue and the curve will be reconstructed to a safer radius. All beam guard within the project limits will be replaced.
- Construction schedule: July 13 - October 15, 2026
The project will replace the existing pavement of WIS 113 from WIS 78 to Mound Street in City of Baraboo. A horizontal curve has been identified as a safety issue and the curve will be reconstructed to a safer radius. All beam guard within the project limits will be replaced.