Traffic Impacts
During construction, WIS 105 remain open to passenger vehicle traffic, but motorists will encounter daytime single-lane closures controlled by flagging during construction of a temporary single-lane bypass on the south side of the road.
- Once built, motorists will use the bypass – controlled by temporary traffic signals – to get around the work zone.
- Heavy truck traffic will be detoured via MN 23, US 2 and WIS 35.
- Access to properties in the work zone will be maintained but may be by alternative routes.