Project Overview
Crews will remove the existing asphalt and concrete pavement, pave a new asphalt pavement surface and install centerline rumble strips. The intersections of WIS 17 South/WD Boyce Drive and County G with US 8 will be reconstructed as single lane roundabouts. The WIS 17 North/Germond Road intersection with US 8 will be milled and overlayed.