US 51 (Harrison Street to County B/AB)

Stoughton, Dane County

Project Overview

Improvements between Harrison Street and Roby Road in the city of Stoughton and the town of Rutland:

  • Reconstruct the existing 4-lane urban section between Harrison Street and Hoel Avenue
  • Expand the existing 2-lane rural section between Jackson Street and Roby Road to a 4-lane urban section
  • Provide a 10-foot wide sidewalk on both sides of US 51 between Jackson Street and Roby Road

Improvements between Roby Road and County B/AB in the city of Stoughton and towns of Rutland and Dunn:

  • Expand the existing 2-lane rural section between Roby Road and County B (east) to a 4-lane urban section
  • Provide a 10-foot wide sidewalk on both sides of US 51
  • Construct a roundabout at the Rutland-Dunn Townline Road intersection (chosen as preferred alternative after November 2021 Public Involvement Meeting)
  • Construct a pedestrian underpass north of the Rutland-Dunn Townline Road intersection
  • Construct a roundabout at the County B (east) intersection
  • Reconstruct the existing 2-lane rural section from County B (east) to County B/AB with a 2-lane rural section, a continuous median, and intersection improvements at each side road
  • Pave shoulders to accommodate bicycles