Overview
Construction along US 51 between Larson Beach Road and Voges Road/Terminal Drive in the village of McFarland is set to improve the current pavement.
- Construction schedule: March 3 - November 2025
Construction along US 51 between Larson Beach Road and Voges Road/Terminal Drive in the village of McFarland is set to improve the current pavement.
- Construction schedule: March 3 - November 2025