Traffic Impacts
During construction:
- WIS 40 is expected to be closed for a week for the railroad crossing replacement in the village.
- Traffic will be detoured via 5th Avenue, Dunn Street and Railroad Avenue.
- Traffic will be maintained using a single lane controlled by temporary traffic signals during work on the Eighteen Mile Creek Bridge.
- For remaining work, US 12 and WIS 40 will remain open to traffic, but motorists will encounter single-lane closures controlled by flagging or automated flagger assistance devices.
- In addition, pedestrian traffic will be detoured during replacement of sidewalk curb ramps.