Construction includes:
- Milling 2.25 inches of existing asphalt and paving 3.25 inches of hot-mix asphalt in rural areas
- Milling 3.25 inches of existing asphalt and paving 3.25 inches of hot-mix asphalt in urban areas
- Replacing joints on the Eighteen Mile Creek Bridge in village of Colfax
- Placing centerline rumble strips in rural areas
- Replacing cross culverts, guardrail and sidewalk curb ramps
- Replacing the railroad crossing in the village of Colfax
- This work will be completed by the railroad.