South section – Maps
Project overview/location
US 12, from Terrytown Rd. south to Ski Hi Rd., around the city of Baraboo, in Sauk County.
- 5.4 miles of proposed four-lane bypass.
- Interchanges scheduled to be constructed at WIS 136 and County W.
- South of Baraboo, the freeway will change to an expressway with limited access to some businesses/homes and full access to the Lehman Rd. and Ski Hi Rd. intersections.
- South section (printable view) (green line on map above)