Overview
The project involves 11.1 miles of construction.
South section- 5.4 miles of proposed four-lane bypass.
- US 12 bypass along Fern Dell Rd. to Frontage Rd. West.
- 5.7 miles of a four-lane bypass.
The project involves 11.1 miles of construction.
South section- 5.4 miles of proposed four-lane bypass.
- US 12 bypass along Fern Dell Rd. to Frontage Rd. West.
- 5.7 miles of a four-lane bypass.