Traffic Impacts
US 10 and WIS 25 North are open to traffic, but motorists will encounter:
- Shoulder closures throughout the duration of the project
- Switches to temporary lanes throughout the staging of reconstruction of the intersection
- Lane closures controlled by flagging
- Traffic is tentatively scheduled to be switched into the roundabout configuration on Tuesday, Nov. 10.