Project Overview
Construction includes:
- Removing a portion of the existing pavement from just west of the north junction of County O to the south junction of County H and placing new pavement
- Removing and recycling a portion of the existing pavement from the south junction of County H to approximately 2,100 feet west of 1010th Street and overlaying the roadway with new pavement
- Widening the paved shoulders from 3 to 5 feet
- Installing centerline and shoulder rumble strips from the south junction of County H to about 2,100 feet west of 1010th Street
- Replacing the existing drainage structure under WIS 85 east of the north junction of County H with a dual box culvert
- Extending a box culvert south of County H
- Replacing a cattle pass that is no longer used with a culvert pipe
- Removing guardrail
- Improving the Chippewa River State Trail crossing to meet Americans With Disabilities Act standards