Project Overview
Construction includes:
- Removing the asphalt pavement and replacing it with 8.5 inches of concrete pavement along with 6 inches of underlying base aggregate
- Replacing storm sewer, sanitary sewer and water main
- Replacing sidewalk, curb ramps, curb and gutter.
- Replacing pavement marking.
- Repairing and replacing existing concrete pavement near I-94 at spot locations
- Making spot repairs on the bridge over the north fork of the Buffalo River (B-61-0282)