Project Overview
Construction on both bridges includes:
- Replacing the modular joints
- Making concrete surface repairs at the west abutments and piers
- Placing a new polymer overlay on the bridge decks
- Replacing pavement markings
Construction on the westbound bridge also includes:
- Replacing the west end joint
- Completing spot painting of bridge pin and hanger system
Construction on the eastbound bridge also includes:
- Replacing the sidewalk railing
Construction on the retaining wall on the Wisconsin approach:
- Replacing the block wall crossing under and adjacent to I-94 and parallel to the pedestrian path
Construction in 2025 includes:
- Completing prep work – widening shoulders – for construction in 2026.