- Construction on both bridges includes:
- Replacing the modular and expansion joints
- Placing a new polymer overlay on the bridge decks
- Making concrete surface repairs
- Cleaning of bridge bearings
- Replacing pavement markings
- Construction on the westbound bridge also includes:
- Making repairs on the east and west abutment back walls
- Completing spot painting of bridge pin and hanger system
- Construction on the eastbound bridge also includes:
- Repairing the east abutment back wall
- Replacing the sidewalk railing
- Construction on the retaining wall on the Wisconsin approach:
- Replacing the block wall crossing under and adjacent to I-94 and parallel to the pedestrian path