Construction in 2024 includes:
- Removing trees to the north of westbound I-94.
- Building temporary crossovers on both sides of each bridge.
- Building temporary bridges in the median at Kinney Road and 100th Street, along with temporary lanes of I-94.
- Installing permanent storm sewer pipes at Kinney Road.
Construction in 2025 includes:
- Building new westbound bridges at Kinney Road and 100th Street.
- Replacing 1,000 to 1,200 feet pavement on westbound I-94 on both sides of the structures.
Construction in 2026 includes:
- Building new eastbound bridges at Kinney Road and 100th Street
- Replacing 1,000 to 1,200 feet pavement on eastbound I-94 on both sides of the structures.