Traffic impacts
During construction, traffic would be managed using two‐way traffic on one side of the divided interstate.
- All ramps will have short-term closures at the WIS 140 interchange with only two ramps closed at a time.
- The northbound on‐ramp and southbound off‐ramp will have short-term closures at the County X/Hart Road interchange.
- A detour will be in place during these closures.