The project will resurface I-43 between WIS 140 and the East Rock County line; replace pavement in localized areas around bridge approaches; and repair six bridge decks within the project limits.
- Construction is scheduled for March 21, 2022 to late October 2022
The project will resurface I-43 between WIS 140 and the East Rock County line; replace pavement in localized areas around bridge approaches; and repair six bridge decks within the project limits.
- Construction is scheduled for March 21, 2022 to late October 2022