History
This section of WIS 50 has been subject to flooding at the Fox River during periods of heavy rain, which has required the road to close.
Public Information Meeting:
A virtual public information meeting was held in September 2020. The video below reviews the history of this section of WIS 50 and how this construction project will improve the corridor.