Skip to content
Project Updates: (click on image)
June 3, Mequon Road to Close Long-Term
May 13, Overnight Full Closures of Mequon Road
February 21, I-43 Northbound Ramps at Mequon Road to Close Long-Term
September 13, Mequon Road Interchange Segment to Begin
2023 Construction:
![](https://projects.511wi.gov/43north-south/wp-content/uploads/sites/705/Mequon-Road-1.png)
What It Will Look Like:
![](https://projects.511wi.gov/43north-south/wp-content/uploads/sites/705/Mequon-Road-2-1024x600.png)
![](https://projects.511wi.gov/43north-south/wp-content/uploads/sites/705/Mequon_Interchange-1024x576.jpg)
** Want a closer look at other design plans along the corridor? Visit wisconsindot.gov/43corridor **