WIS 144 Resurfacing (West Bend to Washington County Line)

Washington County

Project Overview

This project is complete! WisDOT resurfaced and made improvements to approximately 8.5 miles of WIS 144, between Skyline Drive in the city of West Bend and the Washington/Sheboygan County line.

Improvements: 

  • Mill two (2) inches of existing asphalt and replace it with two (2) inches of new asphalt
  • Remove and replace existing guardrail to meet current standards
  • Plant living snow fence (shrubs) in select locations
  • Replace curb ramps to meet ADA standards
  • Remove cattle pass near the county line and replace it with a culvert pipe

Note: At the intersection of WIS 144 and County H, the existing pavement will remain. A roundabout will be constructed at this location in the future. The gap will be re-striped to maintain visibility of pavement markings. View future roundabout project here.

Schedule: 

Work is scheduled to begin in late March and was completed in mid June 2026.