US 12 Resurfacing (County P to WIS 20/WIS 67)

Walworth County

Weekly Project Updates

May 2 Update:

Work continued this week on the US 12 culverts between County H and WIS 67 and on WIS 67. Concrete crews arrived today after getting rained out yesterday. Their work should be completed early next week with curb and gutter and sidewalk installation. The graveled culvert crossings should be patched Wednesday or Thursday and topsoil and restoration crews will be wrapping up next week as well.

On/around 5/12, the milling operations will start up, followed by asphalt paving beginning on 5/15 working east to west (weather dependent). These operations will have flagging for traffic control with locals still having access.

US 12 (From Whitewater)

Traffic:

  1. Local Traffic Only: Area between County P and WIS 67 is open to local traffic. The culvert trenches are graveled but have bump signs on them.
  2. If traveling to Elkhorn and beyond, use the posted detour – County P to County A, County A to County ES, County ES back to US 12.
  3. Access to the Ice Age Trail/WiDNR parking lot can be made by using US 12 from Whitewater.

 

US 12 (From Elkhorn)

Traffic:

  1. Local Traffic Only: Area between County P and WIS 67 is open to local traffic. The culvert trenches are graveled but have bump signs on them.
  2. If traveling to Whitewater, use the posed detour – County ES to County A, County A to County P, County P back to US 12.
  3. WIS 67/WIS 20 will be open so follow US 12 north to WIS 67/WIS 20 and go north or east as needed. There will be a flagging operation when we asphalt patch the trenches next week.