WIS 33 (Mulberry Street to County T)

Baraboo, Sauk County

Overview

The project will reconfigure WIS 33 from a 4-lane roadway to a 2-lane roadway with a 2-way left turn lane in the center of the roadway to improve the safety and operations of the highway.
  • Construction schedule: February 26 - late 2024
more…