Back to Regions
NorthWest
Weekly Construction Updates
- I-94, US 53 interchange to Mallard Road
- US 2/53, WIS 13 Bridge
- Winter Street, US 53 to Susquehanna Avenue, and Susquehanna Avenue, Winter Street to Belknap Street
- US 10, WIS 25 North Intersection
- WIS 27, Sandy Run Creek
- WIS 13, Lake Superior Wayside
- WIS 87, US 8 to Minnesota Street
- WIS 170, Red Cedar River Bridge
- WIS 105, Unnamed Tributary of the Pokegama River
This site provides extended information for construction projects currently underway throughout Wisconsin, with the same real-time conditions information found on the main 511 Wisconsin website.
For information about other plans or studies, visit the Wisconsin DOT website. Statewide real-time traveler information is available by dialing 511 or visiting the main 511 Wisconsin website.