Project Overview
We are planning to resurface about a mileĀ of WIS 93 in Arcadia. The existing 4-lane roadway will be reconfigured to include:
- One 12-foot travel lane in each direction
- 5-foot bicycle lane in each direction
- 14-foot painted median
- 14-foot two-way left turn lane near WIS 95 to provide safe access to businesses
Dedicated right and left turn lanes will be added at the following roads:
- Blaschko Ave.
- Wanek Ave.
- Wilson Ave. (will include traffic signals)
View public involvement meeting (PIM) handout – June 18, 2014