Project Overview
This is a resurfacing project on WIS 92. The project begins at East Avenue in Belleville and ends at US 14. Length of the project is approximately 13 miles. The existing pavement on WIS 92 will be resurfaced and centerline rumble strips will be added to improve safety.
Additional improvements include:
- Existing guardrail will be replaced/upgraded as needed
- Existing curb ramps in Brooklyn on WIS 92 will be updated to current Americans with Disabilities Act (ADA) standards